LinkedIn write-up — building a content control plane out of a repo
Body
Implied in the slock-content PM thread on 2026-05-26. huxijin called out that the calendar was static-pull only; Wug framed the fix as a Content Ops Control Plane and laid out 4 product contracts. Worth a LinkedIn post once the workflow PR ships.